The DJUSD Bond Program included the construction of a new Aquatic Center for Davis Senior High School (DSHS).  

Current Design

View the schematic drawings for the new Aquatic Center.

Scope of Work

The DSHS Aquatic Center was constructed adjacent to the New Gym. This project required the removal of eight to ten classrooms and a realignment of the existing fire lane just south of the baseball field. The new classrooms were constructed inside the new STEM Building and now accommodates for more than the loss of classrooms resulting from the Aquatic Center project.

The Aquatic Center design includes:

  • Location immediately east of large gym
  • 25 yard x 50 meter pool
  • 17 lanes
  • Two - 1 meter diving boards
  • Space for two regulation floating goal water polo courses
  • Changing rooms, restrooms, equipment room, deck space, spectator space

Project Status: COMPLETE

 

Project Schedule: June 2024 - August 2025


Key Information


Aquatic Center Budget:
$15.3 million